● Contract type: Whole process engineering consulting services
● Scale: Covering an area of 1100 mu, with a construction cost of 1.89 billion yuan
● Owner: Nanning Jianning Kangheng Environmental Protection Technology Co., Ltd
● Construction site: Nanning City, Guangxi
● Honor: Won the Gold Award for China Steel Structure
● Project Overview: Featured as one park with multiple zones, intensive collaboration, intelligent transportation management, and green circulation. Covering an area of 1100 mu, the construction cost is 1.89 billion yuan. After the completion of the garbage incineration power plant, the expected annual power generation is about 285 million kWh, and the annual grid exported electricity is about 215 million kWh. After the completion of the organic waste treatment plant, all biogas will be used for power generation, with an annual power generation of about 27.566 million kWh and an annual grid exported electricity of about 19.0994 million kWh. The smoke emission control in the park complies with the strictest standards in China and the European Union. After treatment, production wastewater and domestic wastewater will be used as production water in the park, achieving zero emissions; After solidification, fly ash will be disposed of harmlessly in landfills, slag will be comprehensively utilized for resource utilization, and impurities sorted by organic waste treatment plants will be sent to incineration power plants for treatment, achieving harmless, reduced, and resourceful treatment of solid waste.