Main Business

Relocation of Water Intake Point for Longzhou County Water Plant

2024-08-23| 轻工南宁| 0 Views

●  Capacity: 50000 m3/d ( capacity of the civil works of the water intake pump room is 100000 m3/d) 

●  Project investment: 40 million yuan 

●  Construction site: Xiadong Town, Longzhou County

●  Project Overview: The project adopts a fixed shore type water intake structure, with a box shaped prismatic water intake head, and a circular pump room, put into operation in 2023.


龙州县自来水厂取水点搬迁工程


top