● Capacity: Planned sewage treatment plant with a capacity of 200000 m3/d, including 100000 m3/d at Phase I
● Owner: Guangxi Xianhe Energy Development Co., Ltd.
● Construction site: Laibin City, Guangxi
● Project Overview: This project consists of two parts: a water plant and a sewage treatment plant with complex systems that include pre-treatment, biochemical treatment, and advanced treatment. The terrain elevation difference is considered in design to reduce secondary lifting and energy investment; With our patented technology, the clear water tank and flocculation sedimentation tank are is stacked vertically to reduce land area; By reducing the depth of soil cover around the pool, the cost of anti floating has been reduced; Green landscape withstands the external height differences, reducing vertical treatment measures and the construction costs.
The sewage treatment plant includes: grid well and neutralization pond, mixed flocculation reaction pond, primary sedimentation pond, balance pond and cooling tower, acidification tank, accident pond, sedimentation pond, A/O biochemical pond, secondary sedimentation pond, Fenton reaction and flocculation pond, and Fenton dosing room, as well as supporting works such as dosing, disinfection, backwashing, automation control, power supply and distribution, roads, fences, operation (management) rooms, and landscaping.