● Capacity: 50000 m3/d in the near future of 2020 and 100000 m3/d in the long term of 2030.
● Construction site: Yuigui Economic and Industrial Cooperation Demonstration Zone (Xindu Industrial Zone), Hezhou City, Guangxi
● Project overview: This project is one of the advanced modern water plants in Xindu Industrial Zone, takes Hejiang River water as the water source and includes water treatment facilities such as water intake pump room, grid flocculation tank, horizontal sedimentation tank, reverse filter tank, clean water tank, water supply pump room, and water supply pipeline network, including the design of supporting works such as dosing, disinfection, backwashing, automation, power supply and distribution, roads, fences, office buildings, mechanical maintenance rooms, and landscaping. The entire design separates the management and production area, with advanced technology and high degree of automation. The project utilizes the existing terrain elevation difference and adopts the scheme of stacking up of horizontal sedimentation and clear water tank (our patent), with smooth process flow, high efficiency and energy saving, effectively saving land. This consulting achievement won the second prize of "Excellent Engineering Consulting Achievement in the Light Industry for 2016".